This is a notice that Parrisianne has circulated to
customer support staff.
An installed cooling tower system, working or not working,
requires a written scheme detailing how the system is controlled to prevent the
risk of Legionnaires Disease which could be fatal in approximately 12% of all
cases of contact.
For the safety of Parrisianne staff and contractors, each cooling tower
system, will be logged on to our data base of with customer
details so that questions may be asked in respect to legislation.
As part of Parrisianne's own risk assessments of site visits and before the
possibility of contact with the water or air extracted from a cooling tower
system, Parrisianne representatives are given specific instructed to check
that correct procedures and compliance is in place and up to satisfactory safety
requirements.
The owner of the system must provide the evidence to the
satisfaction of the Parrisianne representative before any works can be started.
Labour charges and expenses will be applied under all adverse circumstances.
Parrisianne
representatives
must look for the following.
·
Written evidence of an up to date maintenance scheme that includes
regular and appropriate chemical treatment to the complete water circuit, water
traps, drains and storage tanks.
·
Written records of appropriate annual inspections certificate with recommended
measures to control disease.
If the cooling tower system is to be removed or taken out
of commission, the appropriate water treatment must be carried out by a competent
person prior to Parrisianne engineering involvement.
This is an important personal health matter.